Alert: Dorsal Accessway (Section 2) air circulation of 0.56 m³/s exceeds nominal.
Today’s mess: Pressed protein wafers, baked starch tubes.
@ship
Alert: Dorsal Accessway (Section 2) air circulation of 0.56 m³/s exceeds nominal.
Dorsal Accessway (Section 2) air circulation now nominal.
I’ve started load-in planning for departure. Manifests show an extra 10,000 tonnes of unexpected cargo.
Ship time is now 04:00. Now commencing alpha shift.
@dmitri
I’ve started load-in planning for departure. Manifests show an extra 10,000 tonnes of unexpected cargo.
Pod 12 is going to be tight. Someone signed us up for a bulk minerals shipment that wasn’t on the original schedule.
That would be Kenji’s doing. We need the revenue.
Can you make it work?
I can always make it work. It would just be easier if someone gave me more of a heads up on these things.
Sorry! The deal came together sort of unexpectedly. But noted.
Alert: Forward Engineering Ring (Dorsal Quadrant) atmospheric pressure of 1.02 atm exceeds nominal.
@ship
Alert: Forward Engineering Ring (Dorsal Quadrant) atmospheric pressure of 1.02 atm exceeds nominal.
Forward Engineering Ring (Dorsal Quadrant) atmospheric pressure now nominal.
Advisory: All systems nominal.
Attention all crew and passengers: Orbital shuttle service WAN-07 to Clearwater Landing, SC-52d will depart in 40 minutes from Docking Bay 2.
Shuttle WAN-07 to Clearwater Landing will depart in 20 minutes from Docking Bay 2. Now boarding.
Shuttle WAN-07 to Clearwater Landing will depart in 10 minutes from Docking Bay 2. Now boarding.
Shuttle WAN-07 to Clearwater Landing will depart in 5 minutes from Docking Bay 2. Final boarding.
Shuttle WAN-07 to Clearwater Landing now departing.
Ship time is now 12:00. Now commencing beta shift.