@ship
30 minutes from departure aperture.
10 minutes from departure aperture. We are five minutes from the commit point.
30 minutes from departure aperture.
Assuming control.
Alert: Aft Engineering Ring (Dorsal Quadrant) air circulation of 0.27 m³/s below nominal.
Probe dispatched.