Today’s mess: Reconstituted protein (RCA Block 10), I Can’t Believe It’s Not Potato!, cilantro.
Alert: System variance detected.
Pod 11 oxygen level of 23.4% exceeds nominal.
Alert: Hazard bearing 326°/-180°.
Time to CPA: 57m
Complexity: 4
Time to CPA: 57m
Complexity: 4
Deploying forward ventral deflector. Connecting to hazard coordination authority.
Hazard coordination authority has instructed us to deflect.
Waiting for vessel to clear firing arc.
Firing arc clear.
Firing forward ventral deflector.
Deflection successful. Hazard trajectory altered.
Alert: Aft Hull, Decks 16-21 water pressure of 575 kPa exceeds nominal.
@ship
Alert: Aft Hull, Decks 16-21 water pressure of 575 kPa exceeds nominal.
Aft Hull water pressure now nominal.
@ship
Pod 11 oxygen level of 23.4% exceeds nominal.
Pod 11 oxygen level now nominal.