ship03:573mtnezukvik27@shipAlert: Aft Engineering Ring (Port Quadrant), Decks 1-3 water pressure of 564 kPa exceeds nominal.Aft Engineering Ring (Port Quadrant) water pressure now nominal.
xlbo05:173mtnjita7is27Dr. Kim has proposed a procedure for the instability in @chang’s primary loop. Her methodology is sound. But the rebuild cannot pause Chang’s duties. The old build and the new would have to run side by side until the new one is validated.
xlbo05:213mtnjpydxpk27It would be considerable. We would need two of everything for a time. I will forward you the figures.
fatima13:003mtodeslhqc27@ship can you dim the corridor lights outside hydroponics during gamma shift? The oyster mushrooms are fruiting toward the door.
ship13:003mtodextvf227Acknowledged. Corridor lighting adjacent to Hydroponics will be reduced to 40% between 20:00 and 06:00.
ship22:443mtpdyysfws27Alert: Dorsal Accessway (Section 8) waste processing effectiveness of 90.9% below nominal.