@ship
30 minutes from departure aperture.
10 minutes from departure aperture. We are five minutes from the commit point.
30 minutes from departure aperture.
Assuming control.
Alert: Aft Engineering Ring (Dorsal Quadrant) air circulation of 0.27 m³/s below nominal.
Probe dispatched.
Counter thrust complete. Commencing tangent burn.
I may take that back after said jump.
Alert: Pod 7, Decks 6-8 temperature of 29.5°C exceeds nominal.
Alert: Aft Hull, Decks 9-14 network connectivity of 42% below nominal.
Scheherazade has transited.