@ship
Alert: Central Accessway (Section 6) water pressure of 575 kPa exceeds nominal.
Central Accessway (Section 6) water pressure now nominal.
Alert: Central Accessway (Section 6) water pressure of 575 kPa exceeds nominal.
Alert: Pod 11 oxygen level of 17.3% below nominal.
Counter thrust complete. Return trajectory established.
Aft Engineering Ring (Starboard Quadrant) air circulation of 0.54 m³/s exceeds nominal.
Initiating counter thrust.
Aft Engineering Ring (Dorsal Quadrant), Decks 1-2 water pressure of 575 kPa exceeds nominal.
Forward Hull, Decks 16-19 lighting spectrum of 1529K below nominal.